Project Marulan South Limestone Mine Haulage Route Design Client Boral Cement Limited Project Value $1M – $10M Project Overview Boral Cement Limited was seeking the realignment and upgrade of Marulan South Road, to ensure compliance with Council and Austroads Standards, as well as for the development of a new cross junction intersection in Marulan South […]
Annual Technical Inspection (ATI) for...
Project Annual Technical Inspection (ATI) for Bankstown Airport Client Sydney Metro Airports Project Value $1M – $10M Project Overview Sydney Metro Airports engaged JJR to undertake the physical survey component of Bankstown Airport’s Annual Technical Inspection (ATI) in accordance with the Civil Aviation Safety Regulations (CASR) 1998 Part 139 Aerodromes and the Manual of Standards […]
Leichardt Market Place and Connection...
Project Leichardt Market Place and Connection Points for Structures Client PowerPark Systems Project Value $1M – $10M Project Overview Engineering designs and drafting was undertaken for PowerPark’s Leichardt Market Place project. The project involved the installation of six arrays onto a concrete slab with post-tensioned cables. JJR Involvement The scope of works for this project […]
Project Management of an eTAG Ground ...
Project Project Management of an eTAG Ground Transport Solution System for the Overseas Passenger Terminal (OPT) and White Bay Cruise Terminal (WBCT) Client Port Authority of NSW Project Value $1M – $10M Project Overview The Port Authority of New South Wales were seeking to integrate an Intelligent Transport System (ITS) solution to improve efficiency of […]
Car Park Solar Structures Upgrade at ...
Client PowerPark Systems Project Value $1M – $10M Project Overview JJR were engaged by PowerPark Systems to provide structural design calculations and engineering drawings for steel structures, footings, and foundations. JJR Involvement JJR combined PowerPark’s design requirements, existing architectural drawings, site surveying data, and soil investigation reports to provide structural design plans relating to foundation […]
Bankstown Airport, Aerodrome Technica...
Project Bankstown Airport Aerodrome Technical Inspection Client Sydney Metro Airports Project Value < $100k Project Overview JJR were engaged by Sydney Metro Airports to conduct an annual technical inspection of the Bankstown Airport facilities. JJR Involvement JJR completed the physical component of the annual technical inspection in accordance with the CASR 1998 Part 139 Aerodromes, […]
Wagga Wagga Airport, Aeodrome Technic...
Project Wagga Wagga Airport Aeodrome Technical Inspection Client Wagga Wagga City Council Project Value $1M – $10M Project Overview JJR were engaged by Wagga Wagga City Council to conduct an annual aerodrome technical inspection of the Wagga Wagga Aerodrome facilities. JJR Involvement JJR conducted an annual technical inspection of the Wagga Wagga Aerodrome facilities with […]
PowerPark, Column Cut-out and Groutin...
Client PowerPark Systems Project Value <$1M Project Overview PowerPark Systems manufactures architecturally elegant steel shade structures for large carparks to house solar panels and provide shaded parking areas. Power park sought to design a column cut out and grouting for steel shade structures. JJR Involvement In this scope of work, JJR considered factors involved with […]
PowerPark Systems, Research and Devel...
Client PowerPark Systems Project Value <$1M Project Overview PowerPark Systems manufactures architecturally elegant steel shade structures for large carparks to house solar panels and provide shaded parking areas. The nature of their structures is not well-served by suggestions on limits of deflection for serviceability limits states checks. JJR Involvement In this scope of work, JJR […]
Port Botany Brotherson Dock, Pilot Je...
Client NSW Ports Project Value <$1M Project Overview The Pilot Jetty and Emergency Response Jetty are located at the eastern end of the re-entrant basin, adjacent to the tug jetty. This jetty includes 3 no. berthing dolphins and steel / timber superstructure to allow passenger and service traffic to the tugs. The Emergency Response […]