Project Retaining Wall and Bridge Repair Structural Certification for the King Georges Road Interchange Upgrade Client Fulton Hogan Construction Project Value < $100k Project Overview The client required engineering verification for parapet starter bars installed during the pouring component of an L-wall that were clashing. JJR Involvement The scope of structural certification included: Certification that […]
Construction Works Road User Experien...
Project Development of Road User Experience for M1 Pacific Motorway Widening Client Fulton Hogan Construction Project Value > $100M Project Overview As a component of the M1 Pacific Motorway Widening, a Road User Experience document was required to satisfy the requirements of the RMS Request for Tender C12. JJR Involvement A Road User Experience […]
Structural Analysis and Certification
Project Structural Analysis and Certification of a Conveyor System at the Port of Eden Client Acora Reneco (Acora) Project Value <$1M Project Overview The Port of Eden wharf and associated components of the ship loading conveying system has been destroyed as a result of large sea swells. The client had been engaged to design, build […]
Geometric Design for Traffic Staging ...
Project Sydney Airport East Tender – John Holland Group Client Caddmandu Design & Drafting Project Value < $100k Project Overview The client required geometric design and drafting services for the Tender stage of the Sydney Airport East Precinct Project. JJR Involvement The scope of the project included: Development of traffic staging layout for each […]
Constructability Advice for the Albio...
Project Constructability Advice for the Albion Park Rail Bypass Client Fulton Hogan Construction Project Value > $100M Project Overview RMS are planning a future extension of the M1 Princes Motorway, which requires a bypass around Albion Park Rail. The client required constructability advice for proposed project works for the Albion Park Rail Bypass. JJR […]
Construction Traffic Staging Design f...
Project Construction Traffic Staging Design for Sydney Airport East Precinct Client John Holland Group Project Value > $100M Project Overview Roads and Maritime Services is planning to upgrade roads east of the airport and remove the General Holmes Drive rail level crossing by constructing a road underpass. The services required by the client are […]
Design Drafting Services for Williamt...
Project Provision of Design Drafting Services for Williamtown Airport New Air Combat Capability (NACC) Client Fulton Hogan Construction Project Value <$1M Project Overview Tender design drawings were required for the New Air Combat Capabilities (NACC) precinct civil and pavement package which includes facility upgrades at RAAF Base Williamtown near Newcastle in the Hunter Valley, NSW […]
Hydraulic Lifting of Existing Residen...
Project Hydraulic Lifting of Existing Residential Structure for the Provision of Additional Living Space Client Private Client Project Value < $100k Project Overview The client planned to increase the usable living area of their existing home through lifting the house and constructing areas underneath including two bedrooms, a bathroom and living room. The project required […]
Design Management of the Foxground to...
Project Design Management of the Foxground to Berry Bypass Client Fulton Hogan Construction Project Value > $100M Project Overview Secondment into the Design Manager role for Fulton Hogan for the Foxground & Berry Bypass for a four-lane highway with median separation for 11.6km of the Princes Highway. JJR Involvement The responsibilities of the design manager […]
White Rock Wind Farm Civil Engineerin...
Project White Rock Wind Farm Civil Drafting Client Fulton Hogan Construction Project Value > $100M Project Overview The wind farm located 20km west of Glen Innes received development approval for 119 turbines from the NSW government in July 2012. The project will include the development of the wind farm and installation of state-of-art wind turbine […]