BUILDING THE FUTURE TOGETHER

Site Inspections and Load Ratings for...

Project Level 3 Bridge Inspections and Load Ratings for Three Jack Arch Overbridges on the Australian Rail Track Corporation (ARTC) North Line Client John Holland Group Project Value <$1M Project Overview John Holland Group (JHR) engaged JJR to carry out site inspections and load rating assessments for three jack arch overbridges on the Australian Rail […]

Compilation of a Cruise Terminal Oper...

Project Compilation of a Cruise Terminal Operations Manual, New South Wales Client Port Authority of New South Wales (NSW) Project Value < $100k Project Overview Port Authority of NSW engaged JJR to develop a Cruise Terminal Operations Manual (CTOM) for the Overseas Passenger Terminal (OPT) and the White Bay Cruise Terminal (WBCT). JJR Involvement JJR […]

Linemarking Setout Plans, Essendon Ai...

Project Linemarking Setout Plans, Essendon Airport Client Essendon Airport Pty Ltd Project Value < $100k Project Overview Essendon Airport engaged JJR to design the aircraft parking layouts for the aircraft apron. JJR Involvement JJR undertook aircraft swept path analysis to design the linemarking for aircraft parking bays in accordance with the CASA Manual of Standards […]

Assessment of Apron and Taxiway Pavem...

Project Assessment of Apron and Taxiway Pavement and Trench Drain Rehabilitation Specification, Archerfield Airport Client Archerfield Airport Corporation Project Value < $100k Project Overview Archerfield Airport Corporation (AAC) engaged JJR to assess infrastructure deterioration between the apron and taxiway pavement and of the collar around the trench drain along the airside hangar entrance. JJR Involvement […]

Site Engineer Support for the Finalis...

Project Site Engineer Support for the Finalisation of the Gooding Drive Roundabout Project Client Queensland Department of Transport & Main Roads (TMR) Project Value <$1M Project Overview The Queensland Department of Transport & Main Roads (QTMR) sought JJR’s expertise to provide contract administration support to finalise the Gooding Drive Roundabout project. JJR Involvement JJR provided […]

Feasibility Options Analysis for MacK...

Project Feasibility Options Analysis for MacKenzie Road Water Main within the Appleton Dock Precinct Client Port of Melbourne Corporation Project Value < $100k Project Overview Port of Melbourne (PoM) engaged JJR to undertake a feasibility options analysis in accordance with the following standards: Australian/NZ codes and standards; and Water industry technical and Melbourne Water standards. […]

Level 3 Bridge Inspection of Deep Cre...

Project Level 3 Bridge Inspection of Deep Creek Bridge Client Paroo Shire Council Project Value < $100k Project Overview Paroo Shire Council (the Council) engaged JJR to carry out a Level 3 bridge inspection of the Deep Creek bridge. The bridge is located within Wyandra, Queensland and was originally a 3-span timber structure, that has […]

Aircraft Parking Plan for an Antonov ...

Project Aircraft Parking Plan for an Antonov 225 at Rockhampton Regional Airport Client Rockhampton Regional Council Project Value < $1M Project Overview Rockhampton Regional Council (the Council) engaged JJR to undertake swept paths analysis for apron parking of an Antonov 225 (AN-225) at Rockhampton Regional Airport and provide parking options for the airplane. JJR Involvement […]

Design Review and Construction Superv...

Project Design Review and Construction Supervision for Construction of the Appleton Dock D Warehouse Fire Main Client Port of Melbourne Project Value $1M – $10M Project Overview Port of Melbourne engaged JJR to review design drawings for construction of the Appleton Dock D Warehouse. JJR Involvement JJR’s experienced engineers reviewed design drawings in accordance with […]

Blindmouth Creek Crossing – Sid...

Project Blindmouth Creek Crossing – Side Track Design Client Brown Contractors Project Value $1M – $10M Project Overview JJR’s engineering expertise and experience was sought by Brown Contractors to design and certify a temporary side track during the construction of a new two-lane causeway and box culvert at the Blindmouth Creek Crossing. JJR Involvement JJR […]