Woolooga Solar Farm Access Roads – De...

Project Woolooga Solar Farm Access Roads – Detailed Designs  Client Lightsource BP Project Value >$100M Project Overview Lightsource BP was seeking to upgrade several intersections at Wide Bay Hwy and an unnamed access road, as well as Gympie-Woolooga Rd and Tones Rd, in order to facilitate better access to the Woolooga Solar Farm. JJR Involvement JJR […]

Mount Beauty Airport Upgrade – Detail...

Project Mount Beauty Airport Upgrade – Detailed Design Client Alpine Shire Council Project Value $1M – $10M Project Overview Alpine Shire Council engaged JJR to provide specialised design consultancy services for a proposed airport upgrade to the Mount Beauty Airport. The upgrade concerned improving access for emergency services aircraft operators by extending and widening the […]

Elcho Island Airport, Charter Apron D...

Client Northern Territory Department of Infrastructure, Planning and Logistics Project Value $1M – $10M Project Overview JJ Ryan Consulting was commissioned by Northern Territory Department of Infrastructure, Planning and Logistics to assess the requirements and limitations to upgrade the charter apron at the Elcho Island aerodrome in accordance with the CASA Manual of Standards 139. […]

Elcho Island Airport Detailed Design ...

Client Tonkin Consulting Project Value $1M – $10M Project Overview Commonwealth department of infrastructure and regional development sought a level 3 inspection for their aerodrome in Balgo Hills. JJR Involvement In this scope of work, JJR conducted inspections in accordance with the Civil Aviation Safety Regulations and provided an Aerodrome Safety Inspection Report, plus an […]

Archerfield Airport, Barton Road Airs...

Client Archerfield Airport Corporation Project Value $1M – $10M Project Overview JJR were engaged by Archerfield Airport Corporation (AAC) to investigate issues relating to drainage and fencing to ensure that the secure airside fence was not compromised and ensure future durability and security of the aerodrome. JJR Involvement For this project JJR conducted a site […]

Peer Review of the Level Rail Crossin...

Client Kingston City Council Project Value >$100M Project Overview Kingston City Council had commissioned JJ Ryan Consulting to review structural plans, technical reports, as well engage with Kingston City Council’s engineers regarding the Patterson River Road Bridge located at Station St, Carrum, Melbourne, Victoria. JJR Involvement JJR reviewed structural plans and technical reports relating to […]

Car Park Solar Structures Upgrade at ...

Client PowerPark Systems Project Value $1M – $10M Project Overview JJR were engaged by PowerPark Systems to provide structural design calculations and engineering drawings for steel structures, footings, and foundations. JJR Involvement JJR combined PowerPark’s design requirements, existing architectural drawings, site surveying data, and soil investigation reports to provide structural design plans relating to foundation […]

Engineering Design and Certification ...

Client Kingston City Council Project Value $1M – $10M Project Overview The Patterson Lakes Community Centre Incorporation required a site inspection, engineering design and certification of a new footpath at the Patterson Lakes Community Centre. JJR Involvement JJR undertook the civil design of the new footpath and associated pram ramps per the design drawings provided […]

PowerPark, Column Cut-out and Groutin...

Client PowerPark Systems Project Value <$1M Project Overview PowerPark Systems manufactures architecturally elegant steel shade structures for large carparks to house solar panels and provide shaded parking areas. Power park sought to design a column cut out and grouting for steel shade structures. JJR Involvement In this scope of work, JJR considered factors involved with […]

PowerPark Systems, Research and Devel...

Client PowerPark Systems Project Value <$1M Project Overview PowerPark Systems manufactures architecturally elegant steel shade structures for large carparks to house solar panels and provide shaded parking areas. The nature of their structures is not well-served by suggestions on limits of deflection for serviceability limits states checks. JJR Involvement In this scope of work, JJR […]