BUILDING THE FUTURE TOGETHER

Long Term Options Analysis for Grasse...

Project Grassed Runways, Long Term Options Analysis Client Archerfield Airport Corporation Project Value < $100k Project Overview Archerfield Airport required engineering services for the realignment and resurfacing of their grassed runway in line with the proposals of their 2011 Master Plan. JJR Involvement The development of the grassed runway project included the following activities: Undertake […]

Options Analysis for a Permanent Hard...

Project Feasibility Analysis of Pavement Seal for Northern Apron Tie-down Area at Archerfield Airport Client Archerfield Airport Corporation Project Value < $100k Project Overview Archerfield Airport were investigating upgrading the northern apron tie-down area through pavement sealing works. An options analysis and reverse brief were required for the project. JJR Involvement The project involved the […]

Storm Damage Repair Design and Projec...

Project Storm Damage Repairs of Hangar 7 at Archerfield Airport Client Archerfield Airport Corporation Project Value < $100k Project Overview Hangar 7 was damaged during severe storm weather, requiring significant repair works. The extent of the damage was the hangar doors, which were flung out and fell onto surrounding aircraft and vehicles during the storm. […]

Airfield Taxiway Rehabilitation Works

Project Rehabilitation Works for Taxiway Juliet at Archerfield Airport Client Archerfield Airport Corporation Project Value < $100k Project Overview The client required a review of previous pavement and drainage repairs for Taxiway Juliet, and identification of future maintenance requirements. JJR Involvement The completed works resulted in the preservation of the pavement to keep out water / […]

Pavement Rehabilitation for Taxiway

Project Pavement Rehabilitation for Taxiway Bravo at Archerfield Airport Client Archerfield Airport Corporation Project Value < $100k Project Overview The client required the development of a Pavement Inspection and Options Analysis Report for Taxiway Bravo to: Identify areas of Taxiway Bravo pavements which require urgent/immediate maintenance repairs or treatments and comment on the current visual […]

Airfield Hangar Column Rehabilitation

Project Column Rehabilitation of Hangar 7 at Archerfield Airport Client Archerfield Airport Corporation Project Value < $100k Project Overview Archerfield Airport required a structural inspection of Hangar 7, in particular the front column which was showing signs of corrosion with complete loss of section in the web. The client requested the development of a permanent repair […]

Shed Condition Assessment

Project Ashover Road Site, Shed Condition Assessment Client Archerfield Airport Corporation Project Value < $100k Project Overview The client required a condition assessment, structural analysis and engineering design to ensure the structure was compliant with Australian Standards. JJR Involvement The scope of works provided included: Visual inspection of the structure to assess the condition; Desktop […]

Airport Boundary Fence Footing and Dr...

Client Barton Road Airport Boundary Fence Footing and Drainage Repairs Client Archerfield Airport Corporation Project Value < $100k Project Overview It was identified that storm water was undermining the Archerfield Airport boundary fence on Barton Road. Archerfield planned to undertake drainage works along the existing grass swale to prevent scouring of soil and protect the fence […]

Installation of a New Generator

Project Installation of a New Generator for Queensland Police Service Client Archerfield Airport Corporation Project Value < $100k Project Overview Review and airport approval for the installation of a new generator for the Queensland Police Service (QPS). JJR Involvement Completion of the works in accordance with the master plan and other airport requirements.

Refurbishment of Airfield Hangar

Project Refurbishment of Hangar 5 at Archerfield Airport Client Archerfield Airport Corporation Project Value < $100k Project Overview The client required refurbishment of Hangar 5 at the airfield, including engineering design of the emergency egress (design of the ramp and associated structures) and project management during the handover and defect close-out phases. JJR Involvement The […]