BUILDING THE FUTURE TOGETHER

Detailed Design and Certification of ...

Project Detailed Design and Certification of a Foundation Slab, Mount Morgan Range Client Hyperion Technology Project Value < $1M Project Overview Hyperion Technology engaged JJR to provide RPEQ certification for an engineering design of a semi-circle foundation slab concrete infill at the Stopford Way Lookout located in the Mount Morgan Ranges. JJR Involvement JJR’s experienced […]

Detailed Design of Four Netball Court...

Project Detailed Design of Four Netball Courts at McDonald Park, Albion Park Client Shellharbour City Council Project Value < $1M Project Overview JJR was engaged by Shellharbour City Council to undertake civil and structural design services including review of the master plan, concept and detailed design of four netball courts in the City of Shellharbour’s […]

Structural Design for Stairs Upgrade ...

Project Structural Design for Stairs Upgrade at Southern Road Reserve Pavilion, Mentone, Victoria Client Cohen Leigh Architects Project Value < $1M Project Overview Cohen Leigh Architects engaged JJR to provide structural design drawings for a stair upgrade to the Southern Road Reserve Pavilion located in Mentone, Victoria. JJR Involvement JJR’s experienced engineers completed and submitted […]

Pavement Condition Assessment at Koor...

Project Pavement Condition Assessment at Kooringa Way, Port Melbourne Client Port of Melbourne Project Value < $1M Project Overview Port of Melbourne engaged JJR to perform a pavement condition assessment on concrete pavement at Kooringa Way, Port Melbourne which is located within four kilometres of the Melbourne Central Business District within the Webb Dock precinct. […]

Detailed Electrical Design for the 11...

Project Detailed Electrical Design for the 11kV Power Pole Relocation at Several Locations within the Tamworth Region Client Tamworth Regional Council Project Value < $1M Project Overview Tamworth Regional Council engaged JJR to prepare a detailed design for the repositioning of power lines, elevation of property supply lines, and overhead power line adjustments to 11kV […]

Detailed Design for a Temporary Acces...

Project Detailed Design for a Temporary Access Road as part of Flood Recovery Works, Lismore Client Symal Group Pty Ltd Project Value > $100M Project Overview JJR was engaged by the Symal Group to provide a detailed pavement design for a temporary access road within the Lismore Flood Recovery Works’ temporary housing area. JJR Involvement […]

Aerodrome Technical Inspections and D...

Project Aerodrome Technical Inspections and Design Report for Potential Upgrade of the Cohuna Airport Client Lions Club of Cohuna Project Value $1M – $10M Project Overview JJR was engaged by the Lions Club of Cohuna, in conjunction with the Cohuna Aerodrome Redevelopment Board to undertake an Aerodrome Technical Inspection (ATI) and Electrical Technical Inspection (ETI) […]

Design and Inspection Report to suppo...

Project Design and Inspection Report to support an Operational Works Application, Nerang Client Private Client Project Value < $1M Project Overview JJR was engaged by a private client to prepare a design and inspection report in response to Council requirements for an operational works application. JJR Involvement JJR’s experienced engineers undertook a site survey using […]

Detailed Design of the Raiseable Seat...

Project Detailed Design of the Raiseable Seating at John Cain Arena, Melbourne Park Client Melbourne and Olympic Parks Trust (MOPT) Project Value $1M – $10M Project Overview The Melbourne and Olympic Parks Trust (MOPT) engaged JJR to prepare a detailed design for modification works at John Caine Arena, which is a multi-purpose sports and entertainment […]

Review of Detailed Design for Lorne R...

Project Review of Detailed Design for Lorne Road Upgrade, Lightning Ridge Client Walgett Shire Council Project Value < $1M Project Overview Walgett Shire Council engaged JJR to undertake a review of the detailed design for Lorne Road, south of Lightning Ridge. JJR Involvement JJR’s experienced engineers conducted a full revision of the technical memorandum in […]