Project Detailed Design for Upgrading Floodway Structure at Golden Mile Road, near Dysart Client Isaac Regional Council Project Value $1M – $10M Project Overview Isaac Regional Council (Council) engaged JJR to undertake roads and stormwater design on Golden Mile Road near Dysart. The main objective was to upgrade the existing low-level floodway crossing and provide […]
Structural Analysis and Certification...
Project Structural Analysis and Certification of As-Built Verandah, Southport Client Private Client Project Value < $1M Project Overview There was a house purchased in Southport which included an illegal verandah extension (i.e. building approval was not obtained from Council). JJR was engaged to conduct a structural analysis of an as-built structure against the Building Code […]
Commissioning Management Plan for the...
Project Commissioning Management Plan for the Northern Beaches Bus-Line Tidal Flow Works Client Fulton Hogan Construction Project Value >$100M Project Overview Fulton Hogan Construction engaged JJR to develop a Commissioning Management Plan (COMP) to optimise the Commissioning and Operational Readiness (COR) of the Northern Beaches B-Line Program Tidal Flow System upgrades. JJR Involvement JJR developed […]
Traffic Guidance Scheme (TGS) for Log...
Project Traffic Guidance Scheme (TGS) for Logan Motorway Works on the Transurban Road Corridor Client McIlwain Civil Engineering Pty Ltd Project Value $10M – $100M Project Overview JJR was engaged by McIlwain Civil Engineering (McIlwain) to provide a long-term Traffic Guidance Scheme (TGS) for Logan Motorway works on the Transurban Road Corridor, as part of […]
Design of Pergola at 30 Mary Street, ...
Project Design of Pergola at Alexandra Headland, Sunshine Coast Client Private Client Project Value <$100k Project Overview JJR was engaged to provide a structural design and calculate design loadings for a new pergola, including model alternatives for additional columns. JJR Involvement JJR expert engineers created a 3D model in structural package SAP2000 to calculate stresses […]
Feature Survey of Taxiway and Apron N...
Project Feature Survey of Taxiway and Apron Network, Bankstown Airport Client Sydney Metro Airports Project Value $1M – $10M Project Overview Sydney Metro Airports (SMA) engaged JJR to undertake a feature survey of the Bankstown Airport (Airport) taxiway and apron network. JJR was previously engaged by SMA to undertake a feature survey of the Airport’s […]
Airside Civil Design for, Essendon Ai...
Project Airside Civil Design for, Essendon Airport Hangar 82 (Bombardier Development) Client Essendon Fields Project Value $10M – $100M Project Overview Essendon Airport (the Airport) engaged JJR to undertake investigations and testing on an apron pavement condition adjacent to Hangar 82 at the Airport. JJR Involvement JJR’s experienced engineers conducted site inspections to the apron […]
Review of Cluster Fencing and Develop...
Project Review of Cluster Fencing and Development of a Standard Specification for the Paroo Shire Client Paroo Shire Council Project Value < $100k Project Overview Paroo Shire Council (Council) engaged JJR to undertake a review of cluster fences within the Shire in accordance with the requirements of the Queensland Transport and Main Roads (QTMR) and […]
Final Design for Replacement of Palme...
Project Final Design for Replacement of Palmer Bridge, Freestone Client Brown Contractors Project Value $1M – $10M Project Overview Brown Contractors (BC) engaged JJR to undertake the design of the Palmer Bridge replacement project for Southern Downs Regional Council. The bridge was a three-span timber bridge of length 25m with carriageway width of 5.5m across […]
Temporary Works Connection Design for...
Project Temporary Works Connection Design for Speedsafe Product to Timber Fascia Client Advanced Group Edge Protection Scaffolding Project Value < $1M Project Overview Advanced Group Edge Protection Scaffolding engaged JJR to calculate design loadings for the Speedsafe product to be connected to a structurally sound fascia. JJR Involvement JJR’s expert engineers calculated the design load […]